NEVI 2 Corridor Groups (October 25 2024)

California-designated corridors are grouped by location and number of new charging stations required under NEVI. Data Dictionary:Corridor Segment - A portion of a highway corridor.Corridor Group - A group of one or more corridor segments.  Alternative Fuel Corridor - The U.S. Department of Transportation Federal Highway Administration (FHWA) designates a national network of plug-in electric vehicle (EV) charging and hydrogen, propane, and natural gas fueling infrastructure along national highway system corridors. To designate these Alternative Fuel Corridors (AFC), FHWA solicits nominations from state and local officials and works with other federal officials and industry stakeholders.Minimum Charging Stations Required - The minimum number of charging stations a corridor segment must have to be eligible for funding for Round 2 of California’s NEVI program solicitation. Minimum Ports Required - The minimum number of new ports a corridor segment must have to be eligible for funding for Round 2 of California’s NEVI program solicitation.Needed Locations - Locations where charging stations need to be sited to ensure the NEVI 50-mile station placement requirement is met for all routes of travel from one AFC to another, if applicable.

Data files

Data title and descriptionAccess dataFile detailsLast updated

CSV


Download
CSV
11/18/24

Shapefile


Download
ZIP
11/18/24

GeoJSON


Download
GEOJSON
11/18/24

KML


Download
KML
11/18/24

File Geodatabase


Download
ZIP
11/25/24

Feature Collection


Download
TXT
11/25/24

Supporting files

Data title and descriptionAccess dataFile detailsLast updated

ArcGIS Hub Dataset


Download
HTML
11/18/24

ArcGIS GeoService


Download
ARCGIS GEOSERVICES REST API
11/18/24

Excel


Download
XLSX
11/25/24

GeoPackage


Download
GPKG
11/25/24

SQLite Geodatabase


Download
GDB
11/25/24