Search results

166 datasets

Utility Wind Project Size by County and State: 2022

  • Published by: California Energy Commission
  • Last updated: Friday, June 13, 2025
  • File types: HTML

This map illustrates the variety of median plant capacity sizes across the United States and California counties for wind plants whose total nameplate...

Utility Wind Project Size by County and State: 2019

  • Published by: California Energy Commission
  • Last updated: Friday, June 13, 2025
  • File types: HTML

This map illustrates the variety of median project capacity sizes across the United States for wind projects whose total nameplate capacity is greater...

Building Climate Zones

  • Published by: California Energy Commission
  • Last updated: Friday, June 13, 2025
  • File types: HTML

The numbers used in the climate zone map don't have a title or legend. The California climate zones shown in this map are not the same as what we comm...

Stations that meet NEVI requirements (March 2024)

  • Published by: California Energy Commission
  • Last updated: Friday, June 13, 2025
  • File types: HTML, ARCGIS GEOSERVICES REST API, CSV, ZIP, GEOJSON, KML

Locations of EV charging stations with DC fast charging capabilities that meet NEVI requirements (as of October 2023).A data dictionary is available a...

Solar PV Capacity for Systems 1 MW and Smaller: 2023

  • Published by: California Energy Commission
  • Last updated: Friday, June 13, 2025
  • File types: HTML

Solar PV Capacity for Systems 1 MW and Smaller: 2023...

Utility Solar Generation and Capacity by Type and County Table: 2019

  • Published by: California Energy Commission
  • Last updated: Friday, June 13, 2025
  • File types: HTML

Utility Solar Generation and Capacity by Type and County Table: 2019...

Utility Solar Generation and Capacity by Type and County Table: 2018

  • Published by: California Energy Commission
  • Last updated: Friday, June 13, 2025
  • File types: HTML

Utility Solar Generation and Capacity by Type and County Table: 2018...

Planned EV Charging Stations Awarded in NEVI Round 1 (December 16 2024)

  • Published by: California Energy Commission
  • Last updated: Friday, June 13, 2025
  • File types: HTML, ARCGIS GEOSERVICES REST API, CSV, ZIP, GEOJSON, KML, TXT, XLSX, GPKG, GDB

This layer features the locations of EV charging stations awarded through Round 1 of California's NEVI funding program that are planned for deployment...

Solar Resource Areas (2022)

  • Published by: California Energy Commission
  • Last updated: Friday, June 13, 2025
  • File types: HTML, ARCGIS GEOSERVICES REST API, CSV, ZIP, GEOJSON, KML

Solar Resource Areas created were produced using a k-means method that groups solar generating plants into discrete regions based on their latitude, l...

DC fast charging stations that do not meet NEVI but within 1-mile of a corridor March 2024

  • Published by: California Energy Commission
  • Last updated: Friday, June 13, 2025
  • File types: HTML, ARCGIS GEOSERVICES REST API, CSV, ZIP, GEOJSON, KML

Locations of DC fast charging stations that do not meet NEVI power-level or port count requirements (as of March 2024) but are within 1-mile of a corr...